Refurbish/Dismantle
Swiss
The dismantling
and export packing of 8500T of plant and equipment that comprised
a Reinforcing Bar Plant in Switzerland. The Project included the
match marking and cataloguing of all equipment to facilitate erection
in Indonesia.
Lime Kilns
The
phased dismantling of three Lime Kilns for Corus including refurbishing
and rebuilding within an agreed timescale, allowing our customer
to maintain production and satisfy their ongoing requirement for
the project. The contract included removal/replacement of the refractory
linings.
Convertor
Vessel Replacements
Replacement
of 6 Convertor Vessels for Mannesmann Demag at three Corus sites
involved the removal of existing units, assembly and installation
of replacements.
|