Ghana
Tema Oil Refinery (TOR), Republic of Ghana
APPROX
VALUE: £4.3 Million
COMPLETION: 11 Months
Detailed
design, procurement, supply, manufacture, construction
and testing of two 45m diameter gas-oil tanks with column
supported roofs and one 45m diameter gasoline tank with
internal aluminium floating deck and aluminium geodesic
roof.
The
second phase of the project entailed full turnkey, procurement,
supply, construction and commissioning of a fire fighting
sprinkler system for LPG truck loading facilities.
|