Case
1 | Case 2 | Case
3 | Case 4 |
Case 5
Design
and fabrication of high strength GRP structural scraper and mixer
bridges
Part of an ongoing contract with the Hong Kong Government.
Designed to survive typhoon conditions and severe corrosion from
raw sewage.
|